The Aseer Directorate of Water Intends to construct & execute pump station to transmit the water from Al-Sharaf tank to Abha Strategic tanks and Om-Elrokeb tanks through two pipelines 600 mm with total length around 3.00 km in addition to a pipe line 900 mm from north Abha strategic reservoirs to Abha new tanker filling station beside pump station with total length 0.80 Km.