North Abha project

North Abha project

The Aseer Directorate of Water Intends to construct & execute pump station to transmit the water from Al-Sharaf tank to Abha Strategic tanks and Om-Elrokeb tanks through two pipelines 600 mm with total length around 3.00 km in addition to a pipe line 900 mm from north Abha strategic reservoirs to Abha new tanker filling station beside pump station with total length 0.80 Km.

North Abha 0

North Abha 1

North Abha 2

 

North Abha 3

North Abha 4

North Abha 5

North Abha 6

Date

13 February 2019

Tags

Pump Stations